2/28/2023 0 Comments Storm project office![]() Presentation material: Tecumseh Storm Drainage Master PlanĪppendix A4 - Public Information Centre No. Our crews worked long days under winter conditions to restore. Public Information Centre No 1 - Presentation BoardsĪdvertising, sign-in and comment sheets, responses to questions After a severe winter ice storm, many New Brunswickers were without power. Appendices: Final Environmental Assessment Report (Volume 1)Īppendix A1 & A2 - Public & Agency ConsultationĪppendix A3 - Public Information Centre No.Appendices: Final Technical Modelling Report (Volume 2).The live fires were conducted to certify British Army MLRS launcher. San Mateo County Department of Public Works Emergency Line (24 Hours), (650) 363-4100. Steel Thunder exercises first began at WSMR in 2011 in close coordination with the STORM Project Office and the British Army. Volume 1 - Final Environmental Assessment Report Keep leaves and yard trimmings out of storm drains and gutters.The Storm Drainage Master Plan Report is available for viewing both electronically and in hard copy. A hard copy is available for public viewing at Town Hall located at 917 Lesperance Road, Tecumseh, Ontario, N8N1W9. Tecumseh Storm Drainage Master Plan Report - Final - 2019 DMAF funding will help advance work on the projects in the accordions. – Project Manager 3200 Deziel Drive, Suite 608, Windsor, ON N8W 5K8 Tel: (519) 948-5000 x 3233Įmail: For additional information, please refer to the full Notice of Study Completion. conveying stormwater with storm drains and sewers end-of-pipe collection. Phil Bartnik, P.Eng., Director Public Works & Environmental Servicesĩ17 Lesperance Road, Tecumseh, ON N8N 1W9Tel: (519) 735-2184 x 148 Construct an underground/surface storage facility within Tecumseh Centre Park.Construct a surface storage facility within Buster Reaume Park and.Construct a surface storage facility within the "Tecumseh Soccer Fields" adjacent to Ecole Secondaire L'Essor.New storm pump station along Southwind Crescent. ![]() at Kensington Blvd.) with an upgraded facility and Replace the existing PJ Cecile Pump Station (Riverside Dr.and Edgewater Blvd.) with an upgraded facility for the consolidated Scully/St. Strategic and Operational Missions (STORM) Project Office Programmatic Support 2021L-01 Strategic and Operational Missions (STORM) Project Office Logistics Support Award W31P4Q-21-F-C002 Effort will be rolled into combined SRD Lifecycle effort. Marks Rd.) and replace the existing Scully Pump Station (Riverside Dr. at Lesperance Rd.) with an upgraded facility Replace the existing Lesperance Pump Station (Riverside Dr. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |